Pre-handover (PCI) inspection in Wyndham Vale

The final inspection before you sign for practical completion, and the last one where the builder carries the full cost of rectification. In Wyndham Vale we follow it with a reinspection.

  • Five to seven days before the practical completion date
  • 2 to 3 hours on site
  • Report within 24 hours
Request your quoteChoose the inspection and we will come back to you with a price.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage7 of 7
When to bookFive to seven days before the practical completion date
Time on site2 to 3 hours on site
Inspected againstThe VBA Guide to Standards and Tolerances 2015, the NCC, your contract drawings and inclusions

What is included in a Wyndham Vale pre-handover (PCI) inspection

  • Every room: paint, plaster, cornices, doors, windows and floors
  • Wall and ceiling finish in natural light
  • Wet areas: tiling, grout, silicone, screens and drainage
  • Kitchen and laundry: cabinetry, benchtops and appliances installed
  • External: render, brickwork, cladding, caulking and paint
  • Roof, gutters, downpipes and stormwater connection
  • Roof space where safely accessible
  • Garage door, slab falls and driveway
  • Paths, porch, alfresco and step compliance
  • Site drainage, ponding and slab edge exposure
  • Fencing, gates, letterbox and clothesline where in contract
  • Contract inclusions and selections against what was built
  • Compliance certificates available for waterproofing, termite and glazing
  • A numbered, photographed defect list for the site supervisor
Why it matters here

Pre-handover (PCI) inspections on Wyndham Vale builds

A leaking shower, cracked roof tiles, weep holes too close to the ground and stormwater pipes left open have all been recorded at Wyndham Vale handovers. Several were still there at the reinspection weeks later.

What we find at this stage in Wyndham Vale

  • Shower leaking when run
  • Cracked roof tiles and broken underlaps
  • Weep holes too close to finished ground
  • Stormwater pipes left uncapped
  • Termite management notice missing
  • Articulation joints left unsealed
Soil and debris sitting in the silt pit, risking a blocked stormwater line, found during a pre-handover inspection in Wyndham Vale
Soil and debris sitting in the silt pit, risking a blocked stormwater line
Roof tiles overhanging the gutter by more than the 65mm allowed, found during a pre-handover inspection in Wyndham Vale
Roof tiles overhanging the gutter by more than the 65mm allowed
Sarking running past the roof edge and needing to be cut back, found during a pre-handover inspection in Wyndham Vale
Sarking running past the roof edge and needing to be cut back
Ceiling insulation batts pushed out of place, leaving bare patches, found during a pre-handover inspection in Wyndham Vale
Ceiling insulation batts pushed out of place, leaving bare patches
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Wyndham Vale

Annotated findings from Pre-handover (PCI) inspections.

Shower recorded as leaking when it was run during the handover walk through, found during a pre-handover inspection in Wyndham Vale
Shower recorded as leaking when it was run during the handover walk through
Cracked roof tile that needs replacing before it lets water into the roof, found during a pre-handover inspection in Wyndham Vale
Cracked roof tile that needs replacing before it lets water into the roof
Weep holes sitting lower above the finished ground than the minimum allows, found during a pre-handover inspection in Wyndham Vale
Weep holes sitting lower above the finished ground than the minimum allows
Stormwater pipe left uncapped and open to construction debris, found during a pre-handover inspection in Wyndham Vale
Stormwater pipe left uncapped and open to construction debris

The other stages of a Wyndham Vale build

  1. Bored piers inspection in Wyndham Vale1Bored piersWith piers bored and cages in, before the concrete is ordered
  2. Slab pre-pour inspection in Wyndham Vale2Slab pre-pourThe day before the pour, when pods, mesh and underlay are all still open
  3. Frame inspection in Wyndham Vale3FrameFrame and trusses complete and roof on, before wall wrap and insulation
  4. Lock-up (pre-plaster) inspection in Wyndham Vale4Lock-up (pre-plaster)Roof, windows and external doors in, before the plasterer starts
  5. Fixing inspection in Wyndham Vale5FixingDoors, skirtings and cabinets in, before the painter arrives
  6. Waterproofing inspection in Wyndham Vale6WaterproofingMembrane applied and cured, before the tiler sets out

All construction stage inspections in Wyndham Vale →

Guides

Construction stage guides for Wyndham Vale

All guides →

Book a pre-handover (pci) inspection in Wyndham Vale

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Wyndham Vale: common questions

When should I send the list to the builder?

As soon as you receive it, and before you sign anything at practical completion.

Should I book a reinspection?

Yes. We have found items still open at Wyndham Vale reinspections that the builder believed were done.

Do you test the shower?

We run it by hand and watch for leaks. Pressure testing of the plumbing is outside what we do.

Will the inspector climb into the roof space at handover?

Yes, where it is safely accessible, to check insulation, sarking and ducts.

How long does the handover inspection take?

Two to three hours for most Wyndham Vale homes.

What happens if I have already signed?

The inspection still documents defects for your warranty claims, but your leverage is stronger before you sign.

CallGet a Free Quote