A Wyndham Vale build moves from bare clay to keys in months, and each trade buries the one before it. We attend at the seven points where that happens and check the work against the engineering for your lot.

  • Pick one stage or book all seven
  • On site before the next trade
  • Measured to your lot's engineering
  • Report back the same or next day
  • Structural items listed first
  • Return visit for open items
  • AS 2870 and AS 1684 referenced
  • Booked around the builder's program
Request your quoteChoose the inspection and we will come back to you with a price.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

The Wyndham Vale build stages we inspect

On the basalt clay of the volcanic plain the slab and its drainage carry more risk than usual, and in the Wyndham suburbs around it we keep recording bracing left off, beams poured narrow and wet areas formed without falls. None of it can be seen once the plaster and tiles go on.

Frame inspection in Wyndham Vale

Frame

Frame and trusses complete and roof on, before wall wrap and insulation

Bracing and tie-downs to the engineering, lateral support to open walls, shear block fixing, lintel clearances and slab level

Learn more about the frame inspection →
Sample findings

Sample defects found during our construction stage inspections in Wyndham Vale

One finding for each stage, from Wyndham Vale and the neighbouring Wyndham and Geelong line suburbs.

Internal slab beam only 50mm wide where the engineering called for 110mm, found during a slab pre-pour inspection in Hoppers Crossing
Internal slab beam only 50mm wide where the engineering called for 110mm, Hoppers Crossing
Bracing shown on the engineering plans not installed, found during a frame inspection in Hoppers Crossing
Bracing shown on the engineering plans not installed, Hoppers Crossing
Alfresco wall frame spanning about three metres with no lateral support, found during a frame inspection in Hoppers Crossing
Alfresco wall frame spanning about three metres with no lateral support, Hoppers Crossing
Heating and cooling ducts crimped by tight bends in the roof space, found during a lock-up inspection in Hoppers Crossing
Heating and cooling ducts crimped by tight bends in the roof space, Hoppers Crossing
Bond breaker missing at a vertical shower junction under the membrane, found during a waterproofing inspection in Lara
Bond breaker missing at a vertical shower junction under the membrane, Lara
Weep holes blocked with mortar, stopping the wall cavity draining, found during a fixing inspection in Hoppers Crossing
Weep holes blocked with mortar, stopping the wall cavity draining, Hoppers Crossing
Shower recorded as leaking when it was run during the handover walk through, found during a pre-handover inspection in Wyndham Vale
Shower recorded as leaking when it was run during the handover walk through
Our inspectors reviewing a report together
Why Wyndham Vale owners choose us

Independent. Licensed. Insured.

  • We come back and tick off your Wyndham Vale handover list item by item, not from memory.
  • Every finding is measured against your contract, the drawings and the Guide to Standards and Tolerances 2015.
  • Volcanic plain clay is read from your soil report, so slab and drainage items are judged for your lot.
  • Your report names the inspector who attended, and that person answers your follow-up calls.
Guides

New Construction Stage Inspections guides for Wyndham Vale

All guides →

Book new construction stage inspections in Wyndham Vale

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

New Construction Stage Inspections in Wyndham Vale: common questions

If I can only book some stages in Wyndham Vale, which ones?

Frame and pre-handover, then the slab pre-pour if the budget allows. Frame is the last look at structure, and the slab matters more than usual on reactive clay.

Which checks sit outside a construction stage visit?

Our inspectors look and check by hand, nothing more invasive. We do not energise or test electrical work, pressure test plumbing, open up finished work, certify engineering or take soil samples. That work sits with the licensed trades, your engineer and the registered building surveyor.

How much notice do you need before a stage?

One to two working days normally works. Pass on the supervisor's date the moment you have it, because stage dates move often.

CallGet a Free Quote