The house is closed to the weather and the plasterer is booked. Everything in the roof and walls that you will never see again is checked now.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
Lock-up is where ducting, insulation, sarking and wet area noggings are all on show at once. We also look again at anything left open from the frame report, because a lined wall ends the conversation.




Annotated findings from Lock-up (pre-plaster) inspections.




1Bored piersWith piers bored and cages in, before the concrete is ordered
2Slab pre-pourThe day before the pour, when pods, mesh and underlay are all still open
3FrameFrame and trusses complete and roof on, before wall wrap and insulation
5FixingDoors, skirtings and cabinets in, before the painter arrives
6WaterproofingMembrane applied and cured, before the tiler sets out
7Pre-handover (PCI)Five to seven days before the practical completion dateInstant online pricing, or talk to the booking team on 1300 471 805.
Because once the ceiling is on, a crimped duct is very hard to reach, and it can cut the airflow to a room.
A durable notice fixed in the meter box recording the termite system installed. We note when it is missing.
Yes. Anything from the frame report that is still visible is checked again and noted if open.
About one to two hours depending on the size of the house.
Yes, for whether it is installed and in place. We do not test thermal performance.
Tell us straight away. The value of the inspection drops with every sheet that goes up.